A large midstream client needed over 14,000 feet of 30-inch pipe installed across state lines. The project stretched from East Texas into Louisiana, requiring six drills, two rigs, and an expert team that could get the job done without compromising the timeline, safety, or the environment.

Superintendent: Charlie Evans

Location: Carthage, Texas

 

Length: 14,170 feet

MAXX HDD was hired to complete the job. As with many horizontal directional drilling (HDD) projects, this route crossed through sensitive areas that demanded strict compliance to protect the environment. MAXX HDD followed standard operating procedures to stay within the right of way and effectively maintain fluid containment.

In the end, the client experienced a smooth, efficient installation without environmental impact.