SERVICES
Expert Horizontal Directional Drilling services
Horizontal directional drilling (HDD) has become a preferred method for installing pipelines and utilities, especially where open trenching isn’t feasible or to minimize environmental impact. This includes rivers, urban environments, traffic crossings, and other sensitive areas.
MAXX HDD combines its mass amount of experience, superior team, and equipment to finish projects safely, on time, and on budget. Our services include:
Horizontal Directional Drilling
Slick Boring
Pipe Extraction
Design Assistance
Field Services
The Right Equipment and Team
We are committed to delivering projects within budget and without delays in the field. This commitment starts with a versatile fleet of late-model directional drills and advanced support equipment.
Beyond equipment, our success is driven by expertise. We’ve built a team of industry-leading professionals with the knowledge and expertise to handle any project.
Beyond equipment, our success is driven by expertise. We’ve built a team of industry-leading professionals with the knowledge and expertise to handle any project.
Serving the Lower 48 States
MAXX HDD services the lower 48 states from our corporate office in Navasota, Texas. We’ve completed a wide scope of directional drilling projects in some of the most difficult conditions.
Featured Projects
Polyethylene Water Pipe Installation
Polyethylene Water Pipe InstallationSuperintendent: Kyle Orum Location: Port Charlotte, FL Length: 1,500 feetA successful installation of 1500 feet of 42” polyethylene water pipe was completed for a water utility client. The bore path ran 60 feet below a major highway...
Tackling Dual Crossings
Tackling Dual CrossingsSuperintendent: Carlton Loftin Location: Katy, Texas Length: 2,796 feet2,796 feet of pipe needed to be installed in an urban area for a midstream operator. The project involved two horizontal directional drilling (HDD) crossings, one under the...
Navigating Unseen Challenges in East Texas
Navigating Unseen Challenges in East TexasSuperintendent: Carlton Loftin, James Bond, and Wayne Robin Location: Tyler, TX Length: 13,129 feetA new construction project for a midstream operator needed over 13,000 feet of pipeline installed through East and Central...



